Banner
Navigation

Navigation

loco-info.com
The reference for locomotives and railcars

Compare locomotives

Add a locomotive

Polish State Railways Pt47

Pt47-65 at a locomotive parade in Wolsztyn in April 2016

After the Second World War, the PKP had the Pt47 developed as a further development of the pre-war Pt31. The P stood for express train, the t for the wheel arrangement 2-8-2 and the number for the year of development....

General

Property Polish State Railways Pt47Remove
Built 1948-1951
Manufacturers Fablok, Cegielski
Wheel arrangement 2-8-2 (Mikado)
Gauge 1,435 mm (Standard gauge)

Dimensions and weights

Property Polish State Railways Pt47Remove
Length 23.84 m
Wheelbase 12.20 m
Rigid wheelbase 6.00 m
Empty weight 97 t
Service weight 104.2 t
Adhesive weight 73.8 t
Axle load 18.3 t
Total weight 183.8 t
Water capacity 33,000 l
Fuel capacity 17 t (coal)

Boiler

Property Polish State Railways Pt47Remove
Grate area 4.49 m²
Firebox surface 19.8 m²
Tube heating surface 219.4 m²
Evaporative heating surface 239.2 m²
Superheater surface 91.5 m²
Total heating surface 330.7 m²

Power plant

Property Polish State Railways Pt47Remove
Driver diameter 1,850 mm
Boiler pressure 15 bar
Expansion type simple expansion
Cylinders two, 630 x 700 mm

Power

Property Polish State Railways Pt47Remove
Power source steam
Indicated power 1,472 kW (2,001 PS)
Top speed 110 km/h
Starting effort 191.5 kN

Calculated values

Property Polish State Railways Pt47Remove
Factor of adhesion 1 : 3.78
Optimal speed 47 km/h
Power-to-weight ratio 14.1 kW/t
Heating Surface Equivalent 521.2 m²
Cylinder volume/HSE 1 : 837.33
Adhesive weight/Total 1 : 1.41
Tractive force/Heating surface 1 : 12.09
Grate area/Heating surface 1 : 73.65
Firebox/Tube surface 1 : 11.08
Total/Superheater 1 : 2.61
Auf Deutsch umschalten

Settings

Your settings are retained for this browser session only.

Consent to cookies

We use cookies to save your display settings. If you decline, the settings are retained only for the current browser session.