Banner
Navigation
loco-info.com
The reference for locomotives and railcars

Boston & Maine class T-1

United States 1928 25 produced
T-1a No. 4008 in April 1939 in Billerica, Massachusetts Edward R. Batson, Jr. / Boston & Maine Historical Society Archives

In 1928, the Boston & Maine procured their first 20 Berkshire-type locomotives from Lima. This meant a leading axle, four driving axles and a two-axle bogie under the firebox. Thanks to the bogie, the grate area could be exactly 100 square feet. After the 20 locomotives of the class T-1a, another five were ordered in the following year and classed T-1b. These were slightly heavier than the T-1a, which were later upgraded to the same level.

Because the adhesive weight was relatively low compared to the power of the engine, the maximum cutoff was set at 60 percent. The actually achieved starting tractive force therefore deviates from the result of the formula usually used, as this assumes a cutoff of 85 percent. An additional 12,000 pounds of traction came from a booster driving the rear axle of the bogie. A special feature of the locomotives was the Coffin feedwater heater, which lay in a semicircle above the smokebox.

The locomotives were unpopular in operation, as the bogie was often the cause of problems. Because the weight of the firebox rested on it, high forces acted on the boiler when running through curves. In addition, the bogie tended to derail when reversing.

In view of the problems, the Boston & Maine was able to sell ten engines to the Southern Pacific and seven to the Santa Fe during World War II. The Santa Fé gave the locomotives a rebuild that increased boiler pressure to 270 psi and used smaller diameter, longer stroke cylinders. These were able to prove themselves in service until 1954, while the others had already disappeared in 1949.

T-1a No. 4012 in August 1940 at North Pownal, Vermont with clearly visible coffin-type feedwater heater on the smoke box John P. Ahrens / collection Taylor Rush

Technical data

General

Property T-1a T-1b
Built 1928 1929
Manufacturers Lima
Wheel arrangement 2-8-4 (Berkshire)
Gauge 1,435 mm (Standard gauge)

Dimensions and weights

Property T-1a T-1b
Wheelbase 12.71 m
Service mass 178.3 t 184.6 t
Adhesion mass 113.5 t 118.8 t
Total mass 276.4 t 333.6 t
Rigid wheelbase 5.03 m
Axle load 28.6 t 29.9 t
Water capacity 45,425 l 66,245 l
Fuel capacity 16.3 t (coal) 20.9 t (coal)

Boiler

Property T-1a T-1b
Grate area 9.29 m²
Firebox surface 37.626 m²
Tube heating surface 439.246 m²
Evaporative heating surface 476.872 m²
Superheater surface 198.441 m²
Total heating surface 675.3 m²

Power plant

Property T-1a T-1b
Driver diameter 1,600 mm
Boiler pressure 14.5 bar 16.5 bar
Expansion type simple expansion
Cylinders two, 711 x 762 mm

Power

Property T-1a T-1b
Power source steam
Estimated power 3,281 kW (4,461 PS) 3,505 kW (4,765 PS)
Starting effort 296.4 kN 338.8 kN
Starting effort booster 53.379 kN

Calculated values

Property T-1a T-1b
Factor of adhesion 1 : 3.76 1 : 3.44
Optimal speed 68 km/h 63 km/h
Power-to-weight ratio 18.4 kW/t 19.0 kW/t
Heating Surface Equivalent 1,061.9 m²
Cylinder volume/HSE 1 : 570.14
Adhesive weight/Total 1 : 1.57 1 : 1.55
Tractive force/Heating surface 1 : 9.17 1 : 10.48
Grate area/Heating surface 1 : 72.69
Firebox/Tube surface 1 : 11.67
Total/Superheater 1 : 2.40
Auf Deutsch umschalten

Settings

Your settings are retained for this browser session only.

Consent to cookies

We use cookies to save your display settings. If you decline, the settings are retained only for the current browser session.