Banner
Navigation
loco-info.com
The reference for locomotives and railcars

Swiss Federal Railways Ce 6/8II and Be 6/8II

Switzerland 1919 33 produced
No. 14276 SBB Historic CC BY-SA 4.0

The SBB needed powerful mountain freight locomotives especially for the electrification of the Gotthard railway. The specifications specified a whole range of requirements. Among them was that the entire Gotthard line from Goldau to Chiasso and back was to be completed in 28 hours with a train weighing 860 tonnes. A pusher locomotive was allowed to assist on the steepest parts. In addition, 300 tonnes should be able to be pulled at 50 km/h at 2.6 percent and overloading by 20 percent should be able to be coped with over a period of 15 minutes. In addition, a regenerative brake was part of the mandatory equipment.

With the Fc 2x3/4, the later Ce 6/8I, a prototype for this task had already been created. However, problems with the bogies were feared due to the high tractive forces on the mountain, so that a different design was finally developed. The solution was two individual bogies that were coupled to each other and carried a body that did not transfer any tractive forces. This design earned them the well-known nickname “Crocodile”.

The bogies each consisted of three coupled axles and one leading axle. The leading axles were designed as Bissel axles and had a lateral play of 83 mm, while the middle coupled axles had a play of 25 mm. The hoods, each with a double motor and other equipment, were mounted on the bogies. The power of the motors was transmitted to the outer coupled axle via a reduction gear and a triangular connecting rod. The locomotive body with the cabs and the transformer lay between the two bogies and had a pivot that could be moved lengthways so that it did not transmit any lateral forces.

For the electric part, the 33 locomotives showed some differences between them. The transformer tray on the first locomotives was air-cooled via cooling fins, while the later ones got their own oil cooler. The tap changer also had a different design depending on the year of manufacture. Since the Gotthard railway was initially only operated at half voltage due to the soot from the steam locomotives that were still running, a switch to 7,500 volts was made possible. As required, a regenerative brake was installed that could feed power back into the overhead line. Electric train heating was also fitted, although use in front of passenger trains was rare.

Since the Gotthard railway was not fully electrified when they were delivered, the locomotives were used right from the start on the Bern-Thun-Spiez route for a short time. They were later used almost all over Switzerland, but primarily on the Gotthard. From 1941, 13 were converted for a speed of 75 km/h and then consequently renamed Be 6/8II.

When the Ae 6/6 was introduced in the 1950's, the Crocodiles were moved to flatter regions. Later they were used as shunting locomotives or in front of slow hopper trains. The first ones were retired in 1968 and the last in 1986. Seven survive today, one of which is operational. Another one is planned to be refurbished.

Schematic drawing with dimensions Locomotive Magazine, December 1920

Technical data

General

Property Ce 6/8II Be 6/8II
Built 1919-1922 ab 1941
Manufacturers mechanical part: SLM, electrical part: Oerlikon
Wheel arrangement 1-C+C-1
Gauge 1,435 mm (Standard gauge)

Dimensions and weights

Property Ce 6/8II Be 6/8II
Length 19.40 m 19.46 m
Wheelbase 16.50 m
Service mass 128 t 126 t
Adhesion mass 104 t 103 t
Rigid wheelbase 4.70 m
Axle load 18.2 t 18 t

Power

Property Ce 6/8II Be 6/8II
Power source electric - AC
Hourly power 1,650 kW (2,243 PS) 2,700 kW (3,671 PS)
Continuous power 1,000 kW (1,360 PS) 1,810 kW (2,461 PS)
Top speed 65 km/h 75 km/h

Calculated values

Property Ce 6/8II Be 6/8II
Power-to-weight ratio 12.9 kW/t 21.4 kW/t
Adhesive weight/Total 1 : 1.23 1 : 1.22

Topics

  • electric locomotive
  • freight
  • crocodile
CompareComment
Last changed: 01/2023

Watch on YouTube

Auf Deutsch umschalten

Settings

Your settings are retained for this browser session only.

Consent to cookies

We use cookies to save your display settings. If you decline, the settings are retained only for the current browser session.