Banner
Navigation

Navigation

loco-info.com
The reference for locomotives and railcars

Rhaetian Railway Ge 4/4I

Switzerland 1947 10 produced
No. 605 and 610 with modern driver's cabs in February 2021 in front of a freight train in Samedan Markus Giger CC BY-SA 2.5

At the same time that the SBB was procuring a modern bogie electric locomotive, the Re 4/4I, the Rhaetian Railway also ordered four similar machines in a smaller version. As with the Re 4/4I, the mechanical part came from the SLM and the electrical system from BBC and Oerlikon. They were the first RhB electric locomotives without a rod drive and, with an initial top speed of 75 km/h, were mainly intended for express trains. Since the first locomotives proved their worth, a further six were purchased in 1953. The maximum towing capacity at 3.5 percent was 185 tonnes and at 4.5 percent 135 tonnes.

The heavier Ge 6/6I that appeared a few years later already contested parts of its area of responsibility. At the latest, the Ge 4/4II built from 1973 pushed the Ge 4/4I out of service with express trains. However, since they were also suitable for use in front of freight trains, they could remain in service for a long time. From 1986 they were modernized, receiving more spacious cabs with a more modern head shape, single-arm pantographs and multiple and push-pull train controls. In the meantime it had been certified for 80 km/h.

Since the 1990s, they have mainly been used in front of freight trains and push-pull trains. Between November 2010 and May 2011, six of the ten examples were scrapped. In 2018, however, the remaining four were still in service, including number 602 after a three-and-a-half year stay at the Lucerne Museum of Transport. The number 603 is to be handed over to the Augsburg Railway Park and some of the others are even being used in front of the Glacier Express.

No. 608 still with historic head shape in 1985 Alain Gavillet / Trams aux fils / CC BY 2.0

Technical data

General

Built
1947, 1953
Manufacturers
mechanical part: SLM, electrical part: BBC, Oerlikon
Wheel arrangement
B-B
Gauge
1,000 mm (Meter gauge)

Dimensions and weights

Length
12.10 m
Service mass
48 t
Adhesion mass
48 t
Axle load
12 t

Power

Power source
electric - AC
Hourly power
1,184 kW (1,610 PS)
Top speed
80 km/h
Starting effort
142.0 kN

Calculated values

Factor of adhesion
1 : 3.32
Power-to-weight ratio
24.7 kW/t
Adhesive weight/Total
1 : 1.00
Auf Deutsch umschalten

Settings

Your settings are retained for this browser session only.

Consent to cookies

We use cookies to save your display settings. If you decline, the settings are retained only for the current browser session.