London, Brighton & South Coast classes B4 and B4x

Great Britain 1899 33 produced
No. 60 “Kimberley” after the nameplate was removed collection Charlie Verrall

The LB&SCR class B4 express locomotives were developed in 1899 by L.B. Billinton because the B2, which had been introduced just a few years earlier, proved to be too weak. Plans were again made to build 25 in Brighton. Since the completion of the third was delayed due to a large backlog of repairs, 25 more B4 were ordered from Sharp, Stewart & Co., all of which were delivered in 1901. Five more were finally built in Brighton in 1902 using boilers supplied by Sharp.

The B4 initially pulled the heaviest express trains until more powerful locomotives appeared in 1912. Between 1922 and 1924, Billinton's son L.B. Billinton had a total of twelve B4 rebuilt with larger superheated boilers and larger cylinders. Because these boilers were too long for the frames, new, longer frames had to be used. Since the locomotives were almost new, they were referred to as class B4x.

Although the boiler of the B4x delivered a lot of steam, it turned out that due to the limited space above the bogie, sufficiently large valves could not be installed and the blast pipe was also not optimally arranged. This meant that they could not fully utilize the steam and timetable speeds higher than 70 mph (113 km/h) could not be scheduled.

The use of the B4 and B4x with express trains ended as early as 1929, so that other tasks were assigned to them. Between 1934 and 1939, 13 locomotives were retired until the Second World War initially stopped this process. Most of the 20 remaining ones came to the British Railways, where all non-rebuilt B4 were retired by May 1951. The B4x followed until December of the same year.

Technical data

General

Property B4 rebuilt B4x
Built 1899-1902 1922-1924
Manufacturers Brighton, Sharp, Stewart & Co. Brighton
Wheel arrangement 4-4-0 (American)
Gauge 1,435 mm (Standard gauge)

Dimensions and weights

Property B4 rebuilt B4x
Wheelbase 6.76 m 7.47 m
Total wheelbase 13.59 m 14.61 m
Service mass 49.8 t 59 t
Adhesion mass 33.5 t 38.5 t
Total mass 77.1 t 98.9 t
Rigid wheelbase 2.67 m 3.05 m
Axle load 15.2 t 20.1 t
Water capacity 13,639 l 16,364 l
Fuel capacity 4.1 t (coal)

Boiler

Property B4 rebuilt B4x
Grate area 2.23 m² 2.304 m²
Firebox surface 11.706 m² 12.914 m²
Tube heating surface 140.191 m² 107.396 m²
Evaporative heating surface 151.897 m² 120.31 m²
Total heating surface 151.9 m² 146.2 m²
Superheater surface 25.92 m²

Power plant

Property B4 rebuilt B4x
Driver diameter 2,057 mm
Boiler pressure 12.4 bar
Expansion type simple expansion
Cylinders two, 483 x 660 mm two, 508 x 660 mm

Power

Property B4 rebuilt B4x
Power source steam
Estimated power 634 kW (862 PS) 783 kW (1,065 PS)
Starting effort 78.9 kN 87.4 kN

Calculated values

Property B4 rebuilt B4x
Factor of adhesion 1 : 4.17 1 : 4.32
Optimal speed 50 km/h 55 km/h
Power-to-weight ratio 12.7 kW/t 13.3 kW/t
Heating Surface Equivalent 210.4 m² 236.7 m²
Cylinder volume/HSE 1 : 1,148.15 1 : 1,130.89
Adhesive weight/Total 1 : 1.48 1 : 1.53
Tractive force/Heating surface 1 : 10.84 1 : 12.48
Grate area/Heating surface 1 : 68.12 1 : 63.47
Firebox/Tube surface 1 : 11.98 1 : 8.32
Total/Superheater 1 : 4.64
Auf Deutsch umschalten

Settings

Your settings are retained for this browser session only.

Consent to cookies

We use cookies to save your display settings. If you decline, the settings are retained only for the current browser session.