Banner
Navigation

Navigation

loco-info.com
The reference for locomotives and railcars

Compare locomotives

Add a locomotive

Furka-Oberalp Railway Ge 4/4[h]III[/h]

No. 81 in September 2020 in Realp

The designation Ge 4/4[h]III[/h] stood for two electric four-axle locomotives ordered by the Furka Oberalp Railway for car trains in the Furka Base Tunnel. They were based on the RhB Ge 4/4[h]II[/h], but were built to...

General

Property Furka-Oberalp Railway Ge 4/4[h]III[/h]Remove
Built 1979
Manufacturers mechanical part: SLM, electrical part: BBC
Wheel arrangement B-B
Gauge 1,000 mm (Meter gauge)

Dimensions and weights

Property Furka-Oberalp Railway Ge 4/4[h]III[/h]Remove
Length 12.90 m
Wheelbase 8.80 m
Rigid wheelbase 2.60 m
Service weight 50 t
Adhesive weight 50 t
Axle load 12.5 t

Power

Property Furka-Oberalp Railway Ge 4/4[h]III[/h]Remove
Power source electric - AC
Electric systems 11.000 V 16,7 Hz
Hourly power 1,700 kW (2,311 PS)
Top speed 90 km/h
Starting effort 102.0 kN

Calculated values

Property Furka-Oberalp Railway Ge 4/4[h]III[/h]Remove
Factor of adhesion 1 : 4.81
Power-to-weight ratio 34.0 kW/t
Adhesive weight/Total 1 : 1.00
Auf Deutsch umschalten

Settings

Your settings are retained for this browser session only.

Consent to cookies

We use cookies to save your display settings. If you decline, the settings are retained only for the current browser session.