Furka-Oberalp Railway Ge 4/4III
Switzerland 1979 2 produced
The designation Ge 4/4III stood for two electric four-axle locomotives ordered by the Furka Oberalp Railway for car trains in the Furka Base Tunnel. They were based on the RhB Ge 4/4II, but were built to be cheaper. Since the FO did not operate previous Ge 4/4 generations, they did not use the number “III” in their designation. Like the RhB locomotives, the FO locomotives had an output of 1,700 kW and a top speed of 90 km/h. They were used with push-pull trains which consisted of a locomotive, a number of car transporters and a driving trailer on the other end. The first locomotive was withdrawn in 2015 and the other in 2023.
Technical data
General
- Built
- 1979
- Manufacturers
- mechanical part: SLM, electrical part: BBC
- Wheel arrangement
- B-B
- Gauge
- 1,000 mm (Meter gauge)
Dimensions and weights
- Length
- 12.90 m
- Wheelbase
- 8.80 m
- Service mass
- 50 t
- Adhesion mass
- 50 t
- Rigid wheelbase
- 2.60 m
- Axle load
- 12.5 t
Power
- Power source
- electric - AC
- Hourly power
- 1,700 kW (2,311 PS)
- Top speed
- 90 km/h
- Starting effort
- 102.0 kN
Calculated values
- Factor of adhesion
- 1 : 4.81
- Power-to-weight ratio
- 34.0 kW/t
- Adhesive weight/Total
- 1 : 1.00