Australian Diesel Locomotives[Inhalt]
Commonwealth Railways class GM
Australia | 1951
47 produced
Genesee & Wyoming Australia's GM43 along with two other units in front of a barley train in April 2008 in Clare Valley, South Australia
Genesee & Wyoming Australia's GM43 along with two other units in front of a barley train in April 2008 in Clare Valley, South Australia
Peripitus
VariantGM 1-11GM 12-47
General
Built1951-1967
ManufacturerClyde Engineering
Axle configA1A-A1A C-C 
Gauge4 ft 8 1/2 in (Standard gauge)
Dimensions and Weights
Service weight237,440 lbs255,360 lbs
Adhesive weight165,760 lbs255,360 lbs
Axle load41,440 lbs42,560 lbs
Boiler
VariantGM 1-11GM 12-47
Power Plant
Power
Power sourcediesel-electric
Top speed89 mph
Starting effort41,440 lbf65,300 lbf
EngineEMD 16-567BEMD 16-567C
Engine typeV16 diesel
Engine output1,500 hp (1,119 kW)1,750 hp (1,305 kW)
Calculated Values
diesel locomotive
passenger
freight
Downer EDi Rail GT46C and GT46C ACe
Australia | 1997
more than 118 produced
Zwei GT46C ACe von SCT Logistics (Specialised Container Transport) im März 2008 im Depot in Laverton, Victoria
Zwei GT46C ACe von SCT Logistics (Specialised Container Transport) im März 2008 im Depot in Laverton, Victoria
Marcus Wong / Wongm

In the 1990s, Clyde Engineering developed the GT46C heavy freight locomotive using prime mover, generator and traction motors from EMD. 24 of these were built, which were only delivered after Clyde Engineering had been bought by EDi Rail. Since the installation of three-phase traction equipment would have exceeded the permitted weight, the newly developed GT46C ACe was introduced in 2007. This uses traction motors from Siemens and electronics from Mitsubishi, among others. Thanks to the three-phase AC technology and a slightly more powerful prime mover, the starting tractive effort increased from 408 to 600 kN. By 2023, 94 locomotives have already been delivered and there are already orders for 36 more. Some of the production is carried out in the USA by EMD (today Progress Rail). Aurizon is a major operator of both generations and Pacific National operates a total of 40 GT46C ACe locomotives.

VariantGT46CGT46C ACe
General
Built1997-2003since 2007
ManufacturerEDi RailDowner Rail, Electro-Motive Division
Axle configC-C 
Dimensions and Weights
Length72 ft 2 1/8 in69 ft 6 5/8 in
Service weight295,419 lbs306,442 lbs
Adhesive weight295,419 lbs306,442 lbs
Axle load49,163 lbs51,147 lbs
Boiler
VariantGT46CGT46C ACe
Power Plant
Power
Power sourcediesel-electric
Top speed71 mph
Starting effort91,722 lbf134,885 lbf
EngineEMD 16-710G3B-ES
Engine typeV16 diesel
Engine output4,200 hp (3,132 kW)4,500 hp (3,356 kW)
Calculated Values
diesel locomotive
freight
three-phase AC
last changed: 08/2023
Downer EDi Rail GT42CU AC and GT42CU ACe
Australia | 1999
194 produced
GT42CU as PN002 of Pacific National in November 2004 on delivery at Downer's Maryborough facility
GT42CU as PN002 of Pacific National in November 2004 on delivery at Downer's Maryborough facility
Colinp
VariantGT42CU ACGT42CU ACe
General
Built1999-20052007-2013
ManufacturerEDi RailDowner Rail
Axle configC-C 
Gauge3 ft 6 in (Cape gauge)
Dimensions and Weights
Length68 ft 2 7/8 in72 ft 2 1/8 in
Service weight264,554 lbs
Adhesive weight264,554 lbs
Axle load44,092 lbs
Boiler
VariantGT42CU ACGT42CU ACe
Power Plant
Power
Power sourcediesel-electric
Top speed62 mph
Starting effort103,412 lbf
EngineEMD 12-710G3B-ES2
Engine typeV12 diesel
Engine output3,299 hp (2,460 kW)
Calculated Values
diesel locomotive
freight
three-phase AC
National Railway Equipment Company 3GS24C-DE-AU
Australia | 2013
5 produced
Nos. 1201 and 1202 in November 2014 at Pelican Point, Adelaide
Nos. 1201 and 1202 in November 2014 at Pelican Point, Adelaide
Daven Walters / www.flickr.com/emd4301

In 2023, NRE manufactured a total of five six-axle freight locomotives for the Australian railway company “El Zorro”. These each have six overhauled D78 traction motors from EMD, which are powered by three Cummins QSK19C, each with around 750 hp. When the first two locomotives were on their way to Australia, El Zorro was liquidated. These two were sold to Bowmans Rail after interim storage at Port Kembla. One of the three locomotives remaining in the USA was delivered to Caraminer S.A. in Uruguay in 2021.

General
Built2013
ManufacturerNational Railway Equipment
Axle configC-C 
Gauge4 ft 8 1/2 in (Standard gauge)
Dimensions and Weights
Length63 ft 11 11/16 in
Service weight251,327 lbs
Adhesive weight251,327 lbs
Axle load41,888 lbs
Boiler
Power Plant
Power
Power sourcediesel-electric
EngineCummins QSK19C
Engine type3x 6-cyl. diesel
Fuel1,321 us gal (diesel)
Engine output2,265 hp (1,689 kW)
Calculated Values
diesel locomotive
Genset
switcher
freight
last changed: 05/2023
National Railway Equipment Company 2GS16B-AU
Australia | 2014
7 produced
PB2 in August 2014 in Lysagths
PB2 in August 2014 in Lysagths
Tjbulic
General
Built2014
ManufacturerNational Railway Equipment
Axle configB-B 
Gauge4 ft 8 1/2 in (Standard gauge)
Dimensions and Weights
Length50 ft 7 7/8 in
Service weight200,620 lbs
Adhesive weight200,620 lbs
Axle load50,265 lbs
Boiler
Power Plant
Power
Power sourcediesel-electric
Top speed37 mph
EngineCummins QSK19C
Engine type2x 6-cyl. diese1
Engine output1,556 hp (1,160 kW)
Calculated Values
diesel locomotive
Genset
switcher
New South Wales class 73
Australia | 1970
50 produced
Nos. 7321 and 7307 in July 2014 in Oberon, New South Wales
Nos. 7321 and 7307 in July 2014 in Oberon, New South Wales
Maksym Kozlenko

In 1969, the New South Wales government initially ordered 20 diesel-hydraulic shunters, which were soon supplemented by 30 more. The engine came from Caterpillar and the transmission from Voith. They were used almost all over the state and replaced all remaining steam locomotives in shunting service. They were able to prove on several occasions that, unlike diesel-electric locomotives, they could also run on flooded tracks. Due to a lack of demand, they were phased out in 1987 and by 1991 almost all of them had either been handed over to private companies or museum railways.

General
Built1970-1973
ManufacturerWalkers
Axle configB-B 
Gauge4 ft 8 1/2 in (Standard gauge)
Dimensions and Weights
Length39 ft 4 in
Wheelbase26 ft 6 in
Service weight109,760 lbs
Adhesive weight109,760 lbs
Axle load27,440 lbs
Boiler
Power Plant
Power
Power sourcediesel-hydraulic
Top speed40 mph
Starting effort25,000 lbf
EngineCaterpillar D379B
Engine typeV8 diesel
Engine output700 hp (522 kW)
Calculated Values
diesel locomotive
switcher
last changed: 03/2023
Queensland Railways class DH
Australia | 1966
73 produced
DH No. 8 in May 1986 at Innisfail, Queensland
DH No. 8 in May 1986 at Innisfail, Queensland
Luke Cossins
General
Built1966-1974
ManufacturerWalkers
Axle configB-B 
Gauge3 ft 6 in (Cape gauge)
Dimensions and Weights
Length41 ft 6 1/16 in
Service weight81,571 lbs
Adhesive weight81,571 lbs
Axle load20,503 lbs
Boiler
Power Plant
Power
Power sourcediesel-hydraulic
Top speed31 mph
Starting effort25,628 lbf
EngineCaterpillar D355E
Engine type6-cyl. diesel
Engine output465 hp (347 kW)
Calculated Values
diesel locomotive
switcher
Queensland Railways class 1300
Australia | 1967
45 produced
No. 1343 in June 1978 at Rockhampton, Queensland
No. 1343 in June 1978 at Rockhampton, Queensland
Steven Haby collection / www.flickr.com
General
Built1967-1972
ManufacturerEnglish Electric
Axle configC-C 
Gauge3 ft 6 in (Cape gauge)
Dimensions and Weights
Length48 ft 0 in
Wheelbase38 ft
Rigid wheelbase11 ft 10 1/2 in
Service weight198,016 lbs
Adhesive weight198,016 lbs
Axle load33,600 lbs
Boiler
Power Plant
Power
Power sourcediesel-electric
Top speed50 mph
Starting effort60,000 lbf
EngineEnglish Electric 12CSVT Mk II
Engine typeV12 diesel
Engine output1,950 hp (1,454 kW)
Calculated Values
diesel locomotive
freight
Queensland Railways class 2170
Electro-Motive Division GL26C-2 (South African class 35-800)
Australia | 1982
45 produced
No. 2195 in April 2016 with the “Spirit of the Outback” in Geebung, Queensland
No. 2195 in April 2016 with the “Spirit of the Outback” in Geebung, Queensland
John Robert McPherson
General
Built1982-1984
ManufacturerClyde Engineering
Axle configC-C 
Gauge3 ft 6 in (Cape gauge)
Dimensions and Weights
Length59 ft 3 in
Wheelbase50 ft 10 in
Rigid wheelbase12 ft 6 in
Service weight214,950 lbs
Axle load35,715 lbs
Boiler
Power Plant
Power
Power sourcediesel-electric
Top speed62 mph
Starting effort64,000 lbf
EngineEMD 16-645E
Engine typeV16 diesel
Engine output2,200 hp (1,641 kW)
Calculated Values
diesel locomotive
passenger
freight
Victorian Railways class W
New South Wales class 71
Australia | 1959
27 produced
W 241 of the operator “El Zorro” in April 2006 in front of a work train in Melbourne
W 241 of the operator “El Zorro” in April 2006 in front of a work train in Melbourne
Marcus Wong

The Victorian Railways class W consisted of 25 shunters built by Tulloch in New South Wales in 1959. They were based on the German V 60 and had a 650 hp V12 diesel from Mercedes, which transmitted its power via a hydraulic transmission from Krupp. Only one axle was driven directly, the other two were connected to it via coupling rods

They were unpopular with the staff and were rebuilt several times. First, the second set of controls was removed in both directions and soon the fast gear was removed, reducing the top speed from 40 to 20 mph. Now they were only used in shunting duties. From 1973 the Mercedes engines were replaced by the Detroit Diesel 12V-149.

Tulloch had built a standard gauge locomotive in the hope of selling this type to the NSWGR. It bore the number 7101 and thus formed class 71. However, the NSWGR sold it to the VR, which used it on the construction site of a standard gauge line. Tulloch had also built a standard-gauge locomotive directly for the VR, but no further orders were placed. This was now used in the same area as the former 7101.

Variantas builtrebuilt
General
Built1959-19601973-1977
ManufacturerTulloch
Axle configC 
Gauge5 ft 3 in (Irish broad gauge)
Dimensions and Weights
Length30 ft 8 in
Service weight108,000 lbs
Adhesive weight108,000 lbs
Axle load36,000 lbs
Boiler
Variantas builtrebuilt
Power Plant
Power
Power sourcediesel-hydraulic
Top speed40 mph20 mph
EngineMercedesDetroit Diesel 12V-149
Engine typeV12 diesel
Engine output650 hp (485 kW)480 hp (358 kW)
Calculated Values
diesel locomotive
switcher
last changed: 04/2024
loading...

We use cookies to save the following settings:

  • selected navigation structure
  • selected language
  • preferred units
  • spelling of railway company names

If you refuse the use of cookies, the settings will only be retained for the current session and will be reset to the default values the next time you visit the site.

Display of units

Here you can set the desired unit system for the technical data.

  • Metric: Lengths in meters, weights in tonnes, and volumes in cubic meters
  • Imperial (UK): Lengths in feet/inches, weights in long tons and volumes in imperial gallons
  • Imperial (US): Lengths in feet/inches, weights in pounds, and volumes in US gallons
  • Individual: Depends on the country of origin of each locomotive
Operator names

Here you can set the display of railway company names.

  • Short: Abbreviation or short form of the name
  • Standard: commonly used name, partially translated to English
  • Complete: full name in local language