loco-info.com
The reference for locomotives and railcars
Navigation
Random
Search
Compare
Settings
Pennsylvania class T1
United States | 1942
52 produced
collection Taylor Rush

After the S1 built at the Altoona Works proved too large and of little practical use, Baldwin built the first two prototypes of the T1 for the PRR during World War II. The reason for purchasing such large express locomotives was that the trains had become heavier and heavier and the K4 class Pacifics used often had to be used double-headed. Like the S1, the T1 was of the duplex type and was streamlined by designer Raymon Loewy.

The first prototype No. 6110
The first prototype No. 6110
Wilkes-Barre Record

The two separate engine groups in one frame were necessary because large moving masses were created with a large wheel diameter and four coupled axles. These stressed the crew of the locomotive and exerted large impacts on the track. For this reason, conventional three- and four-cylinder engines were used in large express locomotives in other countries, which were unpopular in the USA due to the poor accessibility of the inner cylinders.

No. 5507 in December 1945 with a passenger train exiting Chicago
No. 5507 in December 1945 with a passenger train exiting Chicago
collection Taylor Rush

The special feature of the T1 was that two two-cylinder engines, each with two coupled axles, were located one behind the other in a common frame. The biggest disadvantage of the duplex engines was the increased tendency to slip. If one engine group started to slip, the crew could not tell which axles were slip with the help of the exhaust blasts, and they had to be very sensitive with the throttle, especially with such powerful locomotives. For this reason, the rear bogie of the second prototype was designed as a switchable booster to increase the adhesive weight when starting.

When the construction of passenger steam locomotives was possible again after the end of the Second World War, the PRR ordered 50 production machines without boosters. They were significantly more suitable for everyday use than the S1 and still achieved an output of more than 6,000 hp. This enabled them to pull trains weighing around 1,000 tons at 100 mph without any problems and is said to have reached a regular speed of 120 mph to make up for delays. As with the T1, there are unconfirmed reports of trips in excess of 125 mph. The PRR's decision in 1948 to convert all high-value passenger trains to diesel had a negative impact on the service life of the T1. This was also be implemented in a timely manner, so that all T1s were already retired between 1949 and 1952 and subsequently scrapped.

The organization “The T1 Trust” was founded with the aim of building a working T1 from the ground up. Work began in 2014 and by 2020 large parts of the boiler, the driver's cab, parts of the fairing and two coupled wheels had already been completed. An eight-axle model was bought as a tender, which comes from an M1 and is to be provided with a streamlined fairing. After the planned completion in 2030, the locomotive should be used regularly and help to reconstruct the true performance of the originals. With a targeted maximum speed of 140 mph, the previous speed records for steam locomotives are to be broken. In January 2022, the organization said it was 39.1 percent complete on the loco.

General
Built1942, 1946
ManufacturerAltoona, Baldwin
Axle config4-4-4-4 (Duplex) 
Gauge4 ft 8 1/2 in (Standard gauge)
Dimensions and Weights
Length122 ft 9 3/4 in
Wheelbase51 ft 11 in
Rigid wheelbase13 ft 10 in
Total wheelbase107 ft
Service weight502,200 lbs
Adhesive weight279,910 lbs
Total weight944,700 lbs
Axle load71,680 lbs
Water capacity19,200 us gal
Fuel capacity85,200 lbs (coal)
Boiler
Grate area92 sq ft
Firebox area490 sq ft
Tube heating area4,209 sq ft
Evaporative heating area4,699 sq ft
Superheater area1,430 sq ft
Total heating area6,129 sq ft
Power Plant
Driver diameter80 in
Boiler pressure300 psi
Expansion typesimple
Cylindersfour, 19 3/4 x 26 in
Power
Power sourcesteam
Indicated power6,500 hp (4,847 kW)
Optimal speed64 mph
Top speed110 mph
Starting effort64,653 lbf
Calculated Values
steam locomotive
express
duplex
streamline
last changed: 01/2022
loading...

We use cookies to save the following settings:

  • selected navigation structure
  • selected language
  • preferred units
  • spelling of railway company names

If you refuse the use of cookies, the settings will only be retained for the current session and will be reset to the default values the next time you visit the site.

Display of units

Here you can set the desired unit system for the technical data.

  • Metric: Lengths in meters, weights in tonnes, and volumes in cubic meters
  • Imperial (UK): Lengths in feet/inches, weights in long tons and volumes in imperial gallons
  • Imperial (US): Lengths in feet/inches, weights in pounds, and volumes in US gallons
  • Individual: Depends on the country of origin of each locomotive
Operator names

Here you can set the display of railway company names.

  • Short: Abbreviation or short form of the name
  • Standard: commonly used name, partially translated to English
  • Complete: full name in local language